Copyright © Futaleufú Riverkeeper. All rights reserved.

Rio Fuy

Connecting paddlers to save Chile's rivers

The Fuy river is currently threatened by several hydro electric projects led by the Italian company Endesa. Endesa currently has proposed a tunnel that would take water directly from Pirihueico Lake at the top of the Fuy in the town of Puerto Fuy and reroute it through a tunnel to Lago Neltume to the north side of the river. This would effectively dewater the Upper and Middle sections of the river (or at least reduce them to a very low flow). Water would then be put back into the lower section of the Fuy from Lago Neltume. A dam has been proposed at this site. While the owners of the luxury Huilo Huilo lodge seem to value the river for its value as a tourist attraction, they have also allowed Endesa to dig an “exploratory tunnel” to investigate the geology between Lago Pirihueico and Neltume. While this tunnel is framed as only being investigative, it could also easily end up being the diversion tunnel itself.











Actualmente, el río Fuy es amenazado por varios proyectos hidroeléctricos impulsados por la compañía italiana Endesa. Esta propuso un túnel que tomaría agua directamente del lago Pirihueico, origen del río Fuy, para redirigirla al lago Neltume, ubicado en la zona norte del río. Esto afectaría enormemente el caudal del río en sus secciones media y alta. El agua sería entonces restituida en la sección baja del Fuy, donde además ha sido propuesta la construcción de una represa hidroeléctrica. Es paradójico que los dueños del lujoso lodge Huilo Huilo dicen valorar el río por su atractivo turístico, pero han permitido a Endesa cavar un “túnel exploratorio” para realizar un estudio geológico entre el lago Pirihueico y Neltume. Este túnel fue declarado de carácter “investigativo”, pero sospechamos que es una forma de encubrir la construcción del túnel para la central hidroeléctrica de paso.